September 30, 2008
September 22, 2008
Fire! Fire!
September 20, 2008
The Whitlocks
September 19, 2008
September 14, 2008
Large Lunch
It was goooooooooood.....
September 13, 2008
Installing the Installation
This has been a crazy week. The installation had to be fabricated during the first half and installed during the second half. My group members and I spent countless hours heating plexi, shaping it, and clamping it to let it cool. We obsessed over connections, method of installation, and schedule. The image to the left is the final piece of our "aquaduct" which transports water (melted from ice in another art installation) across the ceiling and drips/drops it to a collection device two stories down.
As soon as I get pictures from the camera and grab some from my classmates, I will post a detailed explanation of the final product. Until then, here are a couple of shots of the installation process...
(The image below is of the 24ft walkboard we set up on scaffolding to span the two story gap in order to set up the aquaduct. I spent Wed-Sat up on that thing, coming down only to eat and sleep. You can see the first few spans of the auquaduct, on the left, already hanging from the ceiling.)
September 09, 2008
Forming the Plexi
This is a form like the one you saw in an earlier post (the one we cut with the laser). We are using heat guns (like the ones for stripping paint) to heat the Plexi, and then we are forming it into a slight "channel" to transport water. If that doesn't make sense, it will soon. As soon as we finish the installation, I will post pictures describing the project and how it works...
The gallery exhibition is opening on Saturday evening and we have to be finished with the fabrication and installation of our piece before then...
Triangle Char and Bar
Sunday, Lindsey and I had lunch at Triangle before I had to go into studio. I got a great pulled-pork sandwich with slaw and she had a massive omelet with grits and fruit.